24h

24×7 Customer Support
Phone: +91 129 4090600

Great Place To Work - Certified badge

Liping Khola HPP

2 x 8.13 MW + 10% COL, Nepal

Project parameters:

  • Customer: HIM RIVER POWER LIMITED
    Naxal, Kathmandu, Nepal
  • Unit Output & No. of Units: 8.13 MW + 10% COL & 2 Units
  • Rated Net Head: 785.97m
  • Maximum Net Head: 800.52m
  • Unit Discharge at rated head: 1.21 cumecs
  • Type of Turbine Horizontal: 2 Jet Pelton Turbine (Runner dia. 1150 mm)
  • Turbine Inlet Valve: Ball Valve with metallic service seal (DN 450, PN 93)

 

  • Rated speed: 1,000 rpm
  • Generator Rating: 8.13 MW+10% COL, 11 kV, 1,000 rpm, 0.85 pf
  • Scope: Complete Scope with Horizontal 2 Jet Pelton turbines, MIVs, PPV, Governors, Generators, Transformers, Crane, 132 KV Outdoor Switchyard at powerhouse, receiving and switchyard along with Balance of Plant Mechanical and Electrical as mentioned in the Contract.
  • Location and access: Sindhupalchok district, Nepal
  • Altitude: EL 1,735 m above MSL

About FLOVEL:

FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).

Get in touch with FLOVEL

FLOVEL believes in customer delight. With its technological expertise and senior management’s commitment it brings the Small & Medium Hydro projects alive on time, with maximum performance and minimum downtime. Years of experience have also enabled us to think through and implement projects calmly and clearly. Our customers are glad to have chosen FLOVEL for their Hydropower project.