{"id":10745,"date":"2023-02-21T08:00:52","date_gmt":"2023-02-21T08:00:52","guid":{"rendered":"https:\/\/flovel.net\/kumamoto\/"},"modified":"2023-02-21T08:00:52","modified_gmt":"2023-02-21T08:00:52","slug":"kumamoto","status":"publish","type":"post","link":"https:\/\/flovel.net\/de\/kumamoto\/","title":{"rendered":"Kumamoto"},"content":{"rendered":"
[vc_row][vc_column width=”2\/3″][vc_custom_heading text=”Kumamoto HPP \u2013 Kumamoto Prefecture of Japan, (1 x 185 KW)” use_theme_fonts=”yes”][vc_row_inner][vc_column_inner][vc_single_image image=”10676″ img_size=”large”][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner][vc_column_text]It gives us immense pleasure to announce the commissioning of Kumamoto HPP in Kumamoto prefecture of Japan. This project was commissioned on June 15, 2022. This marked our second commissioned project into Japanese Market after Omokawa HPP.\r\n\r\nThe scope included Design, manufacturing, supply, installation, testing & commissioning of Turbine (with forged runner) and Main Inlet Valve. As per the specific requirement of Japanese customer, we designed and incorporated an electrically actuated servomotor for operation of Guide Vanes & Main Inlet valve. It was exciting to meet stringent quality standards set by the Japanese customer.\r\n\r\nCustomer is extremely delighted with the performance of the machine and has applauded the execution efforts of the FLOVEL team. The smooth commissioning process and excellent operational parameters showcase FLOVEL\u2019s robust and reliable Design, Manufacturing and Project Management capabilities.\r\n\r\nCountry: Japan\r\nLocation: Kumamoto prefecture, Japan\r\nType of water turbines: Horizontal Francis<\/a>\r\nRated Net Head: 23.79 m\r\nRated Turbine Speed: 900 rpm\r\nInstalled Capacity: 1 x 185 kW\r\nFrequency: 60 Hz[\/vc_column_text]
\n
\n
\n \n\n \n <\/i><\/span>\n \n