{"id":7383,"date":"2020-08-18T08:00:25","date_gmt":"2020-08-18T08:00:25","guid":{"rendered":"https:\/\/flovel.net\/nam-long\/"},"modified":"2020-09-16T07:48:30","modified_gmt":"2020-09-16T07:48:30","slug":"nam-long","status":"publish","type":"post","link":"https:\/\/flovel.net\/de\/nam-long\/","title":{"rendered":"Nam Long"},"content":{"rendered":"
[vc_row][vc_column width=”2\/3″][vc_custom_heading text=”Nam Long HPP (2 x 4.5 MW + 10% COL), Vietnam” use_theme_fonts=”yes”][vc_custom_heading text=”August 18th, 2020″ font_container=”tag:h6|text_align:left” use_theme_fonts=”yes”][vc_single_image image=”7379″ img_size=”full”][vc_row_inner][vc_column_inner][vc_column_text]It is with great pleasure we would like to inform that we have signed the Contract for Nam Long HPP (2 x 4.5 MW + 10% Cont. overload) in Vietnam with Horizontal Francis units.\r\n\r\nThis Project is being developed by Dak Nong Power Investment and Management Joint Stock Company and the Main EPC Contractor for this Project is Avico Vietnam Joint Stock Company. FLOVEL signed this Contract jointly with the Developer Company as well as Main EPC Contractor.\r\n\r\nThis project is located in Krong No district \u2013 Dak Nong province and is our first project in this province which is actually 18th Province in Vietnam where FLOVEL has their presence.\r\n\r\nThe completion time of this project is scheduled in the last quarter of 2021.\r\n\r\nThe project parameters are as follows<\/u><\/strong>:\r\n<\/strong>Type of Turbines: Horizontal Francis Turbine<\/a>\r\nRated Head: 37.2 m\r\nInstalled Capacity: 2 x 4,500 kW + 10% COL\r\n\r\n \r\n\r\nFLOVEL’s contractual scope includes supply of Horizontal Francis Turbine, Synchronous Generators, Electrical & Mechanical Balance of Plant, 24 KV Switchgear Equipment and Supervision of erection, testing & commissioning.[\/vc_column_text]
\n
\n
\n \n\n \n <\/i><\/span>\n \n