{"id":7685,"date":"2020-07-15T08:00:17","date_gmt":"2020-07-15T08:00:17","guid":{"rendered":"https:\/\/flovel.net\/klongtron\/"},"modified":"2020-12-16T12:04:49","modified_gmt":"2020-12-16T12:04:49","slug":"klongtron","status":"publish","type":"post","link":"https:\/\/flovel.net\/de\/klongtron\/","title":{"rendered":"Klong Tron"},"content":{"rendered":"
[vc_row][vc_column width=”2\/3″][vc_custom_heading text=”Commissioning of Klong Tron HPP, in Thailand” use_theme_fonts=”yes”][vc_single_image image=”7689″ img_size=”full”][vc_row_inner][vc_column_inner][vc_column_text]The year 2020 has thrown many challenges for all of us. The civil works for Klong Tron HPP in Thailand was ready in June \/ July 2020 in the middle of the COVID pandemic. Our engineers had to travel to Thailand under severe travel restrictions as well as had to serve long quarantine periods to travel to the project site to install and commission the project with bare limited resources.\r\n\r\nThe final product had been appreciated by all including the final customer EGAT. Below pictures of the final commissioned power plant speak for itself:\r\n\r\nThe project parameters are as follows:\r\n<\/strong>Type of Turbines: Horizontal Francis<\/a>\r\nRated Head: 30.55 m\r\nInstalled Capacity: 2 x 1,250 kW\r\n\r\nFLOVEL\u2019s scope included complete water to wire package, including supervision of erection, testing & commissioning.[\/vc_column_text][\/vc_column_inner][\/vc_row_inner]
\n
\n
\n \n\n \n <\/i><\/span>\n \n