{"id":11735,"date":"2023-12-05T08:00:27","date_gmt":"2023-12-05T08:00:27","guid":{"rendered":"https:\/\/flovel.net\/nam_nghe-copy\/"},"modified":"2024-01-10T14:31:11","modified_gmt":"2024-01-10T14:31:11","slug":"surikhola_2","status":"publish","type":"post","link":"https:\/\/flovel.net\/es\/surikhola_2\/","title":{"rendered":"Suri Khola"},"content":{"rendered":"
[vc_row][vc_column width=\u00bb2\/3″][vc_custom_heading text=\u00bbUpper Suri Khola HPP (2 x 3.5 MW), Nepal\u00bb use_theme_fonts=\u00bbyes\u00bb][vc_single_image image=\u00bb11739″ img_size=\u00bblarge\u00bb][vc_row_inner][vc_column_inner][vc_column_text]With immense pleasure, we proudly announce the successful commissioning of Upper Suri Khola HPP.\r\n\r\nClient: Makar Jitumaya Suri Hydropower Ltd, Kathmandu, Nepal\r\nProject Location: Gaurishankar, Dolakha, Nepal\r\n\r\nThe project was commissioned and synchronized to the grid on 25th<\/sup> November 2023 and the plant was handed over to Customer for commercial operation.\r\n\r\nThe Scope of work includes Design, Manufacturing and Supply of Horizontal Pelton Turbine<\/a>, MIV, Generator, Digital Governor, complete E-BOP & M-BOP equipment on water to wire basis and supervision services of erection, testing & commissioning.\r\n\r\nFLOVEL has been earlier associated in three other projects with this esteemed Customer and has successfully commissioned Suri Khola HPP (2 x 3.2 MW + 10% COL) in April 2022. Two other projects namely Sagu Khola 1 (2 x 2.75 MW + 10% COL) and Sagu Khola (3 x 6.67 MW + 10% COL) are under various stages of execution.\r\n\r\nCustomer is extremely delighted with the performance of the machines and has applauded the execution efforts of FLOVEL team. The smooth commissioning process and excellent operational parameters showcase FLOVEL\u2019s robust and reliable Design, Manufacturing and Project Management capabilities.[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner]
\n
\n
\n \n\n \n <\/i><\/span>\n \n