{"id":11897,"date":"2024-01-16T11:54:41","date_gmt":"2024-01-16T11:54:41","guid":{"rendered":"https:\/\/flovel.net\/kambangan-copy\/"},"modified":"2024-01-16T11:59:01","modified_gmt":"2024-01-16T11:59:01","slug":"dongmit","status":"publish","type":"post","link":"https:\/\/flovel.net\/es\/dongmit\/","title":{"rendered":"Dong Mit"},"content":{"rendered":"
[vc_row][vc_column width=\u00bb2\/3″][vc_custom_heading text=\u00bbDong Mit HPP \u2013 Vietnam (2 x 3.5 MW + 28.6% COL)\u00bb use_theme_fonts=\u00bbyes\u00bb][vc_single_image image=\u00bb11863″ img_size=\u00bblarge\u00bb][vc_row_inner][vc_column_inner][vc_column_text]FLOVEL proudly announces the successful commissioning of Dong Mit HPP (2 x 4.5 MW) situated in Binh\u00a0Dinh Province,Vietnam. Both units were commissioned and handed over to the customer on 10th<\/sup> January 2024. This project, owned by M\/s DONG MIT HYDROPOWER INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY <\/strong>is FLOVEL\u2019s 40th<\/sup><\/strong> commissioned project in Vietnam. With this total power generation capacity of FLOVEL in Vietnam has reached to 675 MW.<\/strong>\r\n\r\nScope of work included Design, Manufacturing and Supply of Vertical Full Kaplan Turbines, Generators, Digital Governor, Auxiliary Transformer, and complete E-BOP & M-BOP equipment on water to wire basis. Services included Supervision of complete erection, testing & commissioning.\r\n\r\nThe smooth commissioning process and excellent operational parameters showcase FLOVEL\u2019s robust and reliable Design, Manufacturing and Project Management capabilities.\r\n\r\nThe project parameters are<\/u><\/strong>:\r\n<\/strong>Country: Vietnam\r\nLocation: Binh Dinh Province,Vietnam\r\nType of water turbines: Vertical Kaplan<\/a>\r\nRated Head: 37.0 m\r\nInstalled Capacity: 2 x 3.5MW[\/vc_column_text]
\n
\n
\n \n\n \n <\/i><\/span>\n \n