{"id":6625,"date":"2020-02-01T08:00:42","date_gmt":"2020-02-01T08:00:42","guid":{"rendered":"https:\/\/flovel.net\/kalapa-nunggal-hep-copy\/"},"modified":"2020-02-19T10:08:37","modified_gmt":"2020-02-19T10:08:37","slug":"ghalemdi-khola-hpp","status":"publish","type":"post","link":"https:\/\/flovel.net\/es\/ghalemdi-khola-hpp\/","title":{"rendered":"Ghalemdi Khola HPP"},"content":{"rendered":"
[vc_row][vc_column width=\u00bb2\/3″][vc_custom_heading text=\u00bbGhalemdi Khola HPP (2 x 2,500 KW + 10% COL) Myagdi, Nepal\u00bb use_theme_fonts=\u00bbyes\u00bb][vc_row_inner][vc_column_inner][vc_single_image image=\u00bb6615″ img_size=\u00bbfull\u00bb][\/vc_column_inner][\/vc_row_inner][vc_column_text]Ghalemdi Khola HEP (2 x 2,500 KW + 10% COL) situated in Myagdi District, Nepal was commissioned and synchronized to the grid on 01st<\/sup> February 2020. The project is now handed over to customer for commercial operation.\r\n\r\nScope of works included design, manufacturing and supply of horizontal Francis turbines<\/a> (with fully forged runners), main inlet butterfly valves, generators, governors, complete e-BOP and m-BOP equipment on water to wire basis. Services included delivery of equipment upto site, erection, testing & commissioning. FLOVEL\u2019s overall project management and support during entire Project life cycle was appreciated by our esteemed Customer. Successful commissioning of Ghalemdi project will further strengthen FLOVEL\u2019s presence in the all-important Nepalese hydro power market.\r\n\r\nCountry: Nepal\r\nLocation: Dhawlagiri Zone, Myagdi District, Narchyang, Nepal\r\nType of water turbines: Horizontal Francis\r\nRated Head: 165 meters\r\nInstalled Capacity: 2 x 2,500KW + 10% COL[\/vc_column_text]
\n
\n
\n \n\n \n <\/i><\/span>\n \n