{"id":8038,"date":"2021-06-07T08:00:59","date_gmt":"2021-06-07T08:00:59","guid":{"rendered":"https:\/\/flovel.net\/anakampoil-copy\/"},"modified":"2021-06-11T11:47:38","modified_gmt":"2021-06-11T11:47:38","slug":"namnghe","status":"publish","type":"post","link":"https:\/\/flovel.net\/es\/namnghe\/","title":{"rendered":"Nam Nghe"},"content":{"rendered":"
[vc_row][vc_column width=\u00bb2\/3″][vc_custom_heading text=\u00bbOrder Received \u2013 Nam Nghe 1A HPP (2 x 5 MW), Vietnam\u00bb use_theme_fonts=\u00bbyes\u00bb][vc_custom_heading text=\u00bbJune 7th, 2021″ font_container=\u00bbtag:h6|text_align:left\u00bb use_theme_fonts=\u00bbyes\u00bb][vc_row_inner][vc_column_inner][vc_column_text]#FLOVEL is extremely glad to announce the Contract signing of Nam Nghe 1A HPP (2 x 5 MW) with 2 Jet Horizontal Pelton units. This Project is being developed by Nam Nghe 1A Hydropower Investment and Construction Joint Stock Company.\r\n\r\nNam Nghe 1A Project is located in Nam Nhun District, Lai Chau Province, Vietnam. This project is our NINTH project in Lai Chau province and many more Projects are expected to be developed around this region in near future. Main business of owner is construction (mainly roads and infrastructure) in Lai Chau province and this is the first Hydro project being developed by them.\r\n\r\nThe completion time of this project is scheduled towards the end of second quarter of 2022.\r\n\r\nThe project parameters are as follows<\/u><\/strong>:\r\n<\/strong>Type of Turbines: 2 Jet Horizontal Pelton Turbine<\/a>\r\nRated Head:304.98 m\r\nInstalled Capacity: 2 x 5,000 kW\r\n\r\nFLOVEL\u2019s contractual scope includes supply of 2 Jet Horizontal Pelton Turbine, Synchronous Generators, Electrical & Mechanical Balance of Plant, 110 KV Outdoor Switchyard Equipment and Supervision of erection, testing & commissioning.[\/vc_column_text][\/vc_column_inner][\/vc_row_inner]
\n
\n
\n \n\n \n <\/i><\/span>\n \n