{"id":8305,"date":"2021-07-08T08:00:02","date_gmt":"2021-07-08T08:00:02","guid":{"rendered":"https:\/\/flovel.net\/hongngai-copy\/"},"modified":"2021-08-09T12:50:42","modified_gmt":"2021-08-09T12:50:42","slug":"kombih-3-mhpp","status":"publish","type":"post","link":"https:\/\/flovel.net\/es\/kombih-3-mhpp\/","title":{"rendered":"Kombih 3 MHPP"},"content":{"rendered":"
[vc_row][vc_column width=\u00bb2\/3″][vc_custom_heading text=\u00bbKombih 3 MHPP \u2013 North Sumatera, Indonesia (2 x 5.6 MW) \u00bb use_theme_fonts=\u00bbyes\u00bb][vc_row_inner][vc_column_inner][vc_column_text]FLOVEL proudly announces the commissioning of Kombih 3 MHPP (2 x 5.6 MW) at Pakpak Bharat Regency, North Sumatera, Indonesia. The project was commissioned and synchronized to the grid on 8th<\/sup> July 2021. This is FLOVEL\u2019s eight commissioned Project in Indonesia. Successful commissioning of this project has further strengthened FLOVEL\u2019s presence in the region.\r\n\r\nContract was awarded by Pt. Inpola Mitra Elektrindo to FLOVEL. Scope of works included Design, Manufacturing<\/a>, Supply, Delivery and Installation of complete Electro-Mechanical and Technical Services \u2018Water to Wire\u2019 to PLTM Kombih 3 (2 x 5.6 MW).\r\n\r\nDuteous planning and effective project management resulted in timely completion of supplies. Owing to the travel restrictions due to COVID, the final commissioning was done through remote online support of FLOVEL\u2019s team in India with close coordination and support of Customer\u2019s site team. Efforts of FLOVEL was highly appreciated by our esteemed Customer as well as other Developers in Indonesia.\r\n\r\nCountry: Indonesia\r\nLocation: North Sumatera, Indonesia\r\nType of water turbines: Horizontal Francis<\/a>\r\nRated Head: 81.44 m\r\nInstalled Capacity: 2 x 5.6 MW[\/vc_column_text]
\n
\n
\n \n\n \n <\/i><\/span>\n \n