{"id":8509,"date":"2021-08-09T08:00:07","date_gmt":"2021-08-09T08:00:07","guid":{"rendered":"https:\/\/flovel.net\/nyagak\/"},"modified":"2021-08-09T08:00:07","modified_gmt":"2021-08-09T08:00:07","slug":"nyagak","status":"publish","type":"post","link":"https:\/\/flovel.net\/es\/nyagak\/","title":{"rendered":"Nyagak"},"content":{"rendered":"
[vc_row][vc_column width=\u00bb2\/3″][vc_custom_heading text=\u00bbNyagak III Small Hydro Electric Project (2 x 3.3 MW + 15% COL), Uganda\u00bb use_theme_fonts=\u00bbyes\u00bb][vc_column_text]\r\n
9th August 2021<\/h6>\r\n[\/vc_column_text][vc_row_inner][vc_column_inner][vc_single_image image=\u00bb8477″ img_size=\u00bblarge\u00bb][vc_column_text]We are pleased to inform that we have signed the Contract for Nyagak-III SHEP (2 x 3.3 MW) in Uganda. This is our second project in Uganda.\r\n\r\nThis project is to be implemented through a special purpose venture (SPV) formed with consortium of Hydromax Limited, Dott Services and Uganda Electricity Generation Company Limited (UEGCL).\r\n\r\nThe Project is located on the Nyagak River in north-western Uganda. The project site belongs to Nyapea Sub-County and Okoro County both in Zombo District and close to the border with Democratic Republic of Congo.\r\n\r\nThe project parameters are<\/u><\/strong>:\r\n<\/strong>Type of Turbine: Horizontal Francis<\/a>\r\nRated Head: 112.2 m\r\nInstalled Capacity: 2 x 3.300 KW + 15% COL[\/vc_column_text]
\n
\n
\n \n\n \n <\/i><\/span>\n \n