Nam Cum 1 HPP
Home » Archives for j.geisswinkler » Page 3 Nam Cum 1 HPP 2 x 14.9 MW + 10% COL, Vietnam FLOVEL is extremely glad to announce the signing of the Contract for Nam Cum 1 HPP (2 x 14.9 MW + 10% COL) in Vietnam…
Integrated Solutions
Home » Archives for j.geisswinkler » Page 3 Integrated Solutions for Hydro Power Plants The modern paradigm in hydropower engineering emphasizes water-to-wire solutions. This holistic approach maximizes efficiency, reliability and control. FLOVEL powers the future with state-of-the-art technology, delivering end-to-end integrated electro-mechanical solutions for hydro…
Large size Butterfly Valves
Home » Archives for j.geisswinkler » Page 3 Large size Butterfly Valves Valves have been testimony of longevity and high quality within hydropower plants for more than centuries now. The design features of Butterfly valve make them the mainstay in Hydropower setup be it for…
Gandhisagar HPS
Home » Archives for j.geisswinkler » Page 3 Gandhisagar HPS 5 x 23 MW, India Gandhi Sagar HPS is located in Mandsaur district in the state of Madhya Pradesh – a central part of India. This hydro plant consists of 5 units which were originally…
Foundation Day
Home » Archives for j.geisswinkler » Page 3 Celebrating FLOVEL’s 54th Foundation Day with Pride & Purpose This year, FLOVEL marked its 54th Foundation Day with great enthusiasm, gratitude, and a renewed commitment to giving back to society. As part of the celebrations, we were…
Dana Khola HPP
Home » Archives for j.geisswinkler » Page 3 Dana Khola HPP 54,900 kW, Nepal We are glad to announce that we have been awarded Electro-mechanical Contract for Dana Khola Hydropower Project (Underground Powerhouse consisting of 220 KV GIS) with Net head of 988.27 meters and…
Thong Dak PSI HPP
Home » Archives for j.geisswinkler » Page 3 Thuong Dak PSI HPP 1 x 2,640 kW, Vietnam FLOVEL Energy Private Limited is thrilled to announce the successful commissioning of the TDP Sub Reservoir Hydro Electric Project (1 x 2.64 MW) in Vietnam’s Kontum Province in…
Sagu Khola HPP
Home » Archives for j.geisswinkler » Page 3 Sagu Khola HPP – project commissioned 20,000 kW, Nepal FLOVEL Energy Private Limited announces the successful commercial commissioning of the 20 MW Sagu Khola Hydropower Project (3 x 6.667 MW) in Nepal’s Dolakha District. This landmark achievement,…
Rele Khola HPP
Home » Archives for j.geisswinkler » Page 3 Rele Khola HPP 2 x 3 MW + 10% COL, Nepal FLOVEL proudly announces the successful commissioning of Rele Khola HPP (2 x 3 MW +10% COL) in June 2025. This project, owned by M/s HYM CONSULT…
Dhakrani HEP
Home » Archives for j.geisswinkler » Page 3 Dhakrani HEP Renovation & Upgradation, India FLOVEL proudly announces the successful commissioning of Dhakrani HEP’s Second Unit (Unit-B) (1 x 11.25 MW) in September’ 2025. This project is owned by M/s UJVN Ltd (A Govt. of Uttarakhand…