Suri Khola HPP – Nepal (2 x 3.5 MW)
FLOVEL proudly announces the successful commissioning of SURI KHOLA HPP (2 x 3.5 MW) in April 2022. This project, owned by M/s Makar Jitumaya Suri Hydropower Ltd. – a company located in Nepal, is FLOVEL’s 7th commissioned project in Nepal.
The contract was awarded to FLOVEL for design, manufacture, supply, supervision of erection, testing & commissioning of Electro Mechanical Equipment for SURI KHOLA HEP (2 x 3.5 MW), Gaurishankar Rural Municipality of Dolakha District in province 3 of Nepal.
Installation of equipment and commissioning of plant was completed under round the clock supervision of FLOVEL team. Performance of FLOVEL and quality of machinery was highly appreciated by Customer.
The project parameters are:
Country: Nepal
Location: Gaurishankhar Rural Municipality, Dolakha District in province 3, Nepal via Birgunj Customs Office.
Type of water turbines: Horizontal Pelton
Rated Head: 269.71m
Installed Capacity: 2 x 3.5 MW
About FLOVEL:
FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).