Locate us

Kumamoto HPP – Kumamoto Prefecture of Japan, (1 x 185 KW)

It gives us immense pleasure to announce the commissioning of Kumamoto HPP in Kumamoto prefecture of Japan. This project was commissioned on June 15, 2022. This marked our second commissioned project into Japanese Market after Omokawa HPP.

The scope included Design, manufacturing, supply, installation, testing & commissioning of Turbine (with forged runner) and Main Inlet Valve. As per the specific requirement of Japanese customer, we designed and incorporated an electrically actuated servomotor for operation of Guide Vanes & Main Inlet valve. It was exciting to meet stringent quality standards set by the Japanese customer.

Customer is extremely delighted with the performance of the machine and has applauded the execution efforts of the FLOVEL team. The smooth commissioning process and excellent operational parameters showcase FLOVEL’s robust and reliable Design, Manufacturing and Project Management capabilities.

Country: Japan
Location: Kumamoto prefecture, Japan
Type of water turbines: Horizontal Francis
Rated Net Head: 23.79 m
Rated Turbine Speed: 900 rpm
Installed Capacity: 1 x 185 kW
Frequency: 60 Hz

About FLOVEL:

FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).

Contacto

FLOVEL Energy Private Limited
Vatika Mindscapes,
Suite 101-A, Tower-B,
12/3, Mathura Road,
Faridabad – 121 003,
Haryana, INDIA
Fax: +91 129 4090650