Locate us

Mewa Khola HPP (24.4 MW), Nepal

We are glad to announce that we have been awarded Electro-mechanical Contract for Mewa Khola HPP with Net head of 885 meters and it is our third high head project in Nepal. This is our 24th project in Nepal.

This project is being developed by Union Mewa Hydro Limited, Nepal and is located in Taplejung district, Province 1 in Nepal, around 250 kms. from Biratnagar.

Highly efficient equipment, on time delivery, flawless execution and diligent after sales support in Nepal have rapidly grown our portfolio in this market. These advantages together with FLOVEL’s high performance machines manufactured at our state-of-the-art facility, leads to a successful project and a delighted customer.

Project Key Parameters
Type of Turbine: 2 Jet Horizontal Pelton
Net Head: 885 m
Installed Plant Capacity: 2 x 12.2 MW
Site Altitude: 2023 m masl.

About FLOVEL:

FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).

Contacto

FLOVEL Energy Private Limited
Vatika Mindscapes,
Suite 101-A, Tower-B,
12/3, Mathura Road,
Faridabad – 121 003,
Haryana, INDIA
Fax: +91 129 4090650