Search results
Huayquichuma Hydroelectric Project
Order Secured – Huayquichuma Hydroelectric Project (6.5 MW), Ecuador, LatAm
Bearing Calculation Software
FLOVEL’s Design & Engineering Team is equipped with Dyrobes’ BePerf bearing calculation software.
Pelton Nozzle
We recently upgraded our Pelton Turbine Nozzle alignment process, by using a portable machine.
Karuwa Seti HPP
FLOVEL has signed the contract for Karuwa Seti HPP (3 x 10.667 KW) in Nepal.
Trung Xuan
FLOVEL proudly announce the successful commissioning of Trung Xuan HPP (2 x 5,250 KW) situated in Thanh Hoa Province, Vietnam.
Lower Jogmai
FLOVEL proudly announces the successful commissioning of Lower Jogmai Khola HPP (2 x 3.1 MW + 10% Continuous Overload) in …