Upper Tadi HP

2 x 5.5 MW + 10% COL, Nepal

FLOVEL proudly announces the successful commissioning of Upper Tadi HP (2 x 5.5 MW +10% COL) in July 2025.

The contract was awarded to FLOVEL for design, manufacture, supply, supervision of erection, testing & commissioning of Electro Mechanical Equipment for Upper Tadi HP (2 x 5.5 MW +10% COL), Nuwakot District, Nepal.

Installation of equipment and commissioning of plant was completed under round the clock supervision of FLOVEL team. Performance of FLOVEL and quality of machinery was highly appreciated by Customer.

The project parameters are:
Country: Nepal
Location: Nuwakot District, Nepal
Type of water turbines: Vertical Pelton
Rated Head: 208.08 meters
Installed Capacity: 2 x 5.5 MW +10% COL

About FLOVEL

FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).

Get in touch with FLOVEL

FLOVEL believes in customer delight. With its technological expertise and senior management’s commitment it brings the Small & Medium Hydro projects alive on time, with maximum performance and minimum downtime. Years of experience have also enabled us to think through and implement projects calmly and clearly. Our customers are glad to have chosen FLOVEL for their Hydropower project.