Dhakrani Hydro Electric Project – India (3 x 12,375 kW)
FLOVEL has won the Bid for Renovation, Modernisation and Upgradation of Dhakrani Hydro Electric Project. This plant is one of the most prestigious plants of UJVN Limited(https://www.ujvnl.com). This plant was originally commissioned in the year 1970 by Litostroj, Yugoslavia. With this sizable contract, FLOVEL has further raised its bar with respect to its competency & know how in hydro power sector. The scope includes complete renovation of Electro-mechanical & Hydro mechanical equipment.
FLOVEL’s technical experts are fully geared up to take up the challenges associated with this project so as to complete the work as per the established FLOVEL quality standards.
Scope Includes Reverse Engineering, Design, Engineering, Model Testing, Manufacturing, Supply, Installation, Testing and Commissioning of Complete Electro-Mechanical and Hydro Mechanical equipment such as Turbine, Generator, Static Excitation System, Digital Governor, SCADA, Oil Pressure Unit, Transformers, Control & Protection System, MV switchgear, Draft Tube gates, Intake gates etc.
Salient Features of Project:
Unit Capacity: 12,375 kW
No. of Units: Three
Rated net head: 19.1 m.
Rated Discharge: 66.4 m3/Sec.
Type of Turbine: Vertical Full Kaplan
Speed: 187.5 rpm
About FLOVEL:
FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).