Order Secured – Karuwa Seti Hydro Power Project (32 MW), Nepal

January 17th, 2022

With great pleasure, we wish to inform you that, we have signed Contract for Karuwa Seti HPP (3 x 10,667 KW) in Nepal.

This is our 11th project with complete EM Works and our single largest project in Nepal with 32 MW plant size. FLOVEL has successfully commissioned 7 Projects in Nepal.

Karuwa Seti Project is located in Machhapuchre Rural Municipality, Ward No. 1, Kaski District, Gandaki Province of Nepal. The project site is just one hour drive from Pokhara, a tourism capital of Nepal.

The project key parameters are as follows:
Type of Turbines: Horizontal Francis
Rated Head: 241.5m
Installed Capacity: 32 MW
Site Altitude: 1,280 m masl

FLOVEL’s scope is complete E&M Package which includes Horizontal Francis Turbines, Generators, Valves, Control, Automation & Protection System, complete electrical and mechanical balance of plant and transportation up to project site including erection, testing at site & commissioning.

About FLOVEL:

FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).