Locate us

24h

24×7 Customer Support
Phone: +91 129 4090600

Rele Khola Hydro Power Project (2 x 3,300 kW), Nepal

April 01, 2021

It is with great pleasure, we would like to inform you that, we have signed the Contract for Rele Khola HPP (2 x 3,000 KW + 10% COL) in Nepal.

Rele Khola Hydropower Project is located in Narchyang VDC of Myagdi District of Nepal. The proposed intake site is located at an elevation of about 2,240 m. Myagdi district is a destination for tourism. The world-famous Poon Hill lies in the Ghara VDC of this district. Ghorepani is another attraction for travelers.

The project parameters are as follows:
Type of Turbines: Twin Jet Horizontal Pelton
Rated Head: 509.66 m
Installed Capacity: 2 x 3,000 KW + 10% COL
Site Altitude: 1,700 m MASL

FLOVEL’s scope is complete E&M Package including Horizontal Twin Jet Pelton Turbines, Generators, Valves, Control, Automation & Protection System, complete electrical and mechanical balance of plant and transportation up to project site including full erection, testing & commissioning.

About FLOVEL:

FLOVEL name has been synonymous with the hydro power sector for over four decades. FLOVEL is a full-line supplier of electromechanical equipment and services for small and medium size hydro power plants manufacturer of hydraulic turbines, valves and turnkey supplier of electro mechanical packages for hydro power projects and ranks amongst the leading players globally. FLOVEL manufacturers complete range of Pelton, Francis, Kaplan, Axial Flow turbines and Valves for hydropower projects. The strength of FLOVEL is in its ability to offer all-inclusive solutions (Electro Mechanical-Turnkey Packages).

Contact

FLOVEL Energy Private Limited
Vatika Mindscapes,
Suite 101-A, Tower-B,
12/3, Mathura Road,
Faridabad – 121 003,
Haryana, INDIA
Fax: +91 129 4090650